12-31-2015 ERFPD Vehicle and Equipment Maintenance Service AgreementVEHICLE AND EQUIPMENT MAINTENANCE SERVICE AGREEMENT fGGlrl,[� Uc_ This agreement is made and entered into this 31st day of , 2015 by and between Eagle River Fire Protection District whose address is P.O. Box 7980, Avon Colorado, 81620 (hereafter know as "ERFPD ") and the Town of Avon whose address is P.O. Box 975, 500 Swift Gulch Road, Avon, Colorado, 81620 (hereafter designated as "Contractor "). In consideration of the obligation of ERFPD to pay the Contractor as herein provided and in consideration of the other terms and conditions hereof, the parties agree as follows: 1. Contractor Services: Contractor will, during the term of this Agreement, provide the following services (collectively the "Services "): (a) Routine maintenance and preventive maintenance ( "Routine Maintenance ") of the ERFPD vehicles and equipment. Service will be performed on approximately 29 vehicles and equipment listed in Exhibit A. The number of vehicles serviced may be increased or decreased in ERFPD's sole discretion. Routine Maintenance will be performed at a minimum frequency and scope of work consistent with the manufacturer's recommendations or when initiated at the request of ERFPD. (b) Repair and replacement work as requested by ERFPD ( "Repair and Replacement "). No payment for any Repair and Replacement shall be due unless ERFPD has approved of such charges. Services may be commenced with verbal approval by ERFPD of a written or verbal estimate provided by Contractor. Repair and Replacement includes, without limitation, transmissions repairs, engine repairs, rear end repairs and any other work or repairs exceeding $2,000.00. ERFPD acknowledges that subcontractors will perform certain repair work. Contractor shall be responsible for assuring that all such subcontracted work will be performed promptly and in accordance with the terms and conditions of this Agreement. 2. Facilities: Contractor represents that its facilities are in good repair and adequately equipped and that it has a sufficient staff to perform all work in a timely manner. 3. Compensation: In consideration of Contractor's services during the term of this Agreement, ERFPD will pay Contractor a unit hourly shop rate for Routine Maintenance and Repair and Replacement. This unit rate shall be $107.00 per hour for light duty vehicles and equipment and $116.00 per hour for heavy duty vehicles and equipment. Materials and sublet work shall be charged at cost plus Fifteen percent (15 %). There will be a Misc. Shop Charge of ten percent (10 %) of the labor per work order. Invoice shall be issued by the 10th of each month for services performed the previous month. Payment shall be remitted within thirty (30) days of receipt of invoice. Contractor's Fueling Facilities may be used by ERFPD. The cost of Unleaded Gasoline and Diesel Fuel will be at the Contractor's cost plus ten cents per gallon. Contractor's vehicle washing facility may be used by ERFPD. Contact TOA for 2016 Town of Avon Vehicle and Equipment Maintenance Contract 10/13/2015 Page 1 of 5 current wash rates. Late payment and past due amounts shall be subject to interest as set forth in Chapter 3.32 of the Avon Municipal Code. 4. Terms and Termination: This Agreement will be effective as of January 1, 2016 and will tenninate on December 31, 2016 unless either party fails to substantially perform the duties and obligations in accordance herewith. In such an event, the non - defaulting party may tenninate this Agreement by providing seven (7) days written notice to that the defaulting party, unless the defaulting party cures the breach within the seven (7) day remedy period. Either party may tenninate this Agreement without cause by providing thirty (30) days written notice. 5. Relationships and Taxes: The relationship between the parties is that of independent contracting parties, and nothing herein shall be deemed or construed by the parties hereto or by any third party as creating a relationship of principal and agent or partnership, or of a joint venture between the parties. Contractor shall be solely responsible for any tax, withholding or contribution levied by the Federal Social Security Act. Contractor is not entitled to unemployment compensation or other employment related benefits, which are otherwise made available by ERFPD to its employees. Contractor shall provide ERFPD an original of its Form W -9 (Request for Taxpayer Identification Number of Certification). 6. Warranty: Contractor shall perfonn all Services in a prompt, efficient and workmanlike manner. Contractor shall promptly correct any defective work. This warranty shall be in lieu of all other warranties, express or implied. Contractor's sole liability hereunder, whether in tort or in contract, is expressly limited to the warranty provided for herein. 7. Assignment: Contractor's duties hereunder requires particular expertise and skills, and may not be assigned to any third party without the expressed written consent of ERFPD, and any attempt to do so shall render this Agreement null and void and no effect as respects the assignee (s) and shall constitute an event of default by Contractor. 8. Waiver: Failure to insist upon strict compliance with any terms, covenants, and/ or conditions hereof shall not be deemed a waiver of such term, covenant, or condition, nor shall any waiver or relinquishment of any right or power hereunder at any time or more times be deemed a waiver or relinquishment of such right or power at any other time or times. 9. Benefit: The terms, provisions, and covenants contained in this Agreement shall apply to, inure to the benefit of and be binding upon the parties hereto and their respective heirs, successors in interest, and legal representatives except as otherwise herein expressly provided. 10. Situs and Severability: The laws of the State of Colorado shall govern the interpretation, validity, perfonnance and enforcement of this Agreement. If any provision of this Agreement shall be held to be invalid or unenforceable, the validity and enforceability of the remaining provisions of this Agreement shall not be affected thereby. 2016 Town of Avon Vehicle and Equipment Maintenance Contract 10/13/2015 Page 2 of 5 11. Modification: This Agreement contains the entire agreement between the parties, and no agreement shall be effective to change, modify, or tenninate in whole or in part unless such agreement is in writing and duly signed by the party against whom enforcement of such change, modification, or tennination is sought. 12. Non - Liability of Town for Indirect or Consequential Damages or Lost Profits: Parties agree that the Contractor shall not be liable for any indirect or consequential damages which may arise from any breach of this Service Agreement by Contractor or which may arise by the Contractor's breach of warranty. 13. No Waiver of Governmental Immunity: Nothing in this Agreement shall be construed to waive, limit, or otherwise modify any govermmental immunity that may be available by law to the Contractor, its officials, employees, contractors, or agents, or any other person acting on behalf of the Contractor and, in particular, governmental immunity afforded or available pursuant to the Colorado Governmental Immunity Act, Title 24, Article 10, Part 1 of the Colorado Revised Statutes. 14. No Third Party Beneficiaries: Nothing contained in this Agreement is intended to or shall create a contractual relationship with, cause of action in favor of, or claim for relief for, any third party, including any agent, sub - consultant or sub - contractor of ERFPD. Absolutely no third party beneficiaries are intended by this Agreement. Any third -party receiving a benefit from this Agreement is an incidental and unintended beneficiary only. 15. Article X, Section 20 /TABOR: The Parties understand and acknowledge that the Town and the District are subject to Article X, § 20 of the Colorado Constitution ( "TABOR "). The Parties do not intend to violate the terms and requirements of TABOR by the execution of this Agreement. It is understood and agreed that this Agreement does not create a multi - fiscal year direct or indirect debt or obligation within the meaning of TABOR and, therefore, notwithstanding anything in this Agreement to the contrary, all payment obligations of the Town are expressly dependent and conditioned upon the continuing availability of funds beyond the term of the Town's current fiscal period ending upon the next succeeding December 31. Financial obligations of the Town payable after the current fiscal year are contingent upon funds for that purpose being appropriated, budgeted, and otherwise made available in accordance with the rules, regulations, and resolutions of Town of Avon, and other applicable law. Upon the failure to appropriate such funds, this Agreement shall be terminated. EXECUTED this 31st day of Y EXECUTED this day of b& , 2015. 2015. Eagle River Fire Protection District TOWN OF AVON Digitally signed by Karl Bauer Karl Bauer DN cn =Karl Bauer, o =Eagle Niver Fire By: Protection District, ou, By: email =kbauer @eaglerivert`ire.org, c =US ate: 2016 Town of Avon Vehicle and Equipment Maintenance Contract 10/13/2015 Page 3 of 5 EXHIBIT A VIN I Year I Manufacturer I Equipment I Unit I Code Type # 4P1CTO2SOYA000936 .2000 Pierce Pumper 111 H Quantum 4P1 CT02S61 A001 708 2001 Pierce Pumper 119 �H Quantum 1 FDAX57F82EC50563 2002 Ford F550 Wildland pumper i 124 L 1 FV6TMDB6XHA41448 1998 Pierce Tender _ 125 H 1GNEK13Z73J319076 2003 Chevrolet Tahoe 128 L 1GCHK29U33E308690 2003 Chevrolet K2500 Pick up 129 L 4P1 CT02HX3A003274 20031P. 003 Pierce Pumper 131 H Quantum 16HPB1424WU011442 .1998 Haulmark Trailer 1131T L 2CNDL23F456099517 2005 Chevrolet Equinox 132 L 4- P5T8222X81121016 2008 PJ Flat bed Trailer 132T L 4P1 CD01 H76A005812 2006 Pierce Dash Pumper 133 H 1 GNFK13037R223541 2007 Chevrolet Tahoe 134 L 1GCHK39D07E176757 2007 Chevrolet K3500 Pick up 135 L 1 FDAX57P87EB47966 2007 Ford F550 Wildland pumper 136 L 1GNFK130X7J401864 2007 Chevrolet Tahoe 137 L 4P1 CD01 H97A007515 2007 Pierce Dash Pumper $138 H 4P1 CD01 H07A007516 2007 Pierce Dash Pumper 1139 H 1G1ZJ571328F195948 2008 Chevrolet Malibu 140 L 3GNGK26K08G215700 2008 Chevrolet Suburban 141 L 3 1 GNFK130X8R204020 2008 Chevrolet Tahoe 142 L 1GNFK130X8R202218 2008 Chevrolet Tahoe 143 L 2CNDL63F286280384 2008 Chevrolet Equinox 144 L 1GCHK29608E176691 2008 Chevrolet K2500 Pick up 145 L 4P1 CU01 HX8A008545 2008 Pierce Aerial 146 s H Quantum i 1HTWEAZR89136549 2007 International Wildland pumper' 147 H 4P1 CA01 WEA014253 2014 Pierce Arrow Pumper 101 H 2014 Pierce Arrow Pumper 102 H 1 HTSEAAN1 VH402101 1996 International Rescue 1520 H 1FVDCYCY2EHFK8728 2013 FreightLiner Wildland pumper 301 H Code indicates H — heavy duty (e.g., large buses) or L — light duty — (e.g., supervisor vehicles, small cut-away s). 2016 Town of Avon Vehicle and Equipment Maintenance Contract 10/13/2015 Page 4 of 5 EXHIBIT A VIN Year Manufacturer Equipment Type Unit # Code 1GNSK2E07ER180238 12014 IChevrolet (Tahoe 902 L 1 2014 Chevrolet Tahoe 903 L 1574150252 11940 IGMC Gilman 1 L Code indicates H — heavy duty (e.g., large buses) or L — light duty — (e.g., supervisor vehicles, small cut - aways). END EXHIBIT A 2016 Town of Avon Vehicle and Equipment Maintenance Contract 10/13/2015 Page 5 of 5