PZC Res. No. 2004-03TOWN OF AVON
PLANNING & ZONING COMMISSION
RESOLUTION NO. 04-03
SERIES OF 2004
A RESOLUTION RECOMMENDING TO THE TOWN COUNCIL OF THE TOWN OF
AVON APPROVAL OF A PUD DEVELOPMENT PLAN FOR LOT 61, BLOCK. 2,
BENCHMARK AT BEAVER CREEK SUBDIVISION, TOWN OF AVON, EAGLE
COUNTY, COLORADO
WHEREAS, the Applicant, IDG3 LLC has applied for approval of the Lot 61 PUD
Development Plan for Lot 61, Block 2, Benchmark at Beaver Creek Subdivision; and
WHEREAS, after notices required by law, a public hearing on said application was held by
the Planning & Zoning Commission of the Town of Avon; and
WHEREAS, said application is consistent with all legal requirements.
NOW, THEREFORE, BE IT RESOLVED that the Planning and Zoning Commission hereby
recommends approval to the Town Council of the Town of Avon for the Lot 61 PUD
Development Plan dated January 2, 2003 with the following conditions:
1. The new Benchmark Road alignment (50'0" Benchmark Court Right -of Way) must be
conveyed by subdivision plat prior to approval of the Lot 61 PUD Development Plan.
2. Development Standards shall be as follows:
• A minimum of 150- timeshare, interval ownership, and fractional fee ownerships
units @ 900 net sq.ft. above grade including a recreational amenity fees.
• A minimum of 125 condominium units above grade @ 1,250 net sq.ft.
• A minimum of 200 hotel /accommodation units above grade.
• Public transportation facilities including 300 S.F. transit /administrative offices
and public restroom facilities at grade, immediately adjacent to transit center.
• A minimum of 17,000 square feet of commercial /retail space, which does not
include personal service shops.
• All parking shall comply with the Avon Municipal Code parking standards.
3. This PUD Amendment is contingent upon a valid Development Agreement between
IDG3 LLC and the Town of Avon being approved.
4. If necessary, IDG3 LLC will be responsible for the acquisition of additional water rights
and their subsequent dedication to the Town prior to issuance of a building permit to
amend the Town's Augmentation Plan.
5. Failure to develop and obtain final design approval, including compliance with the Town
Center design guidelines of the site - specific development plan by January 31, 2012 shall
automatically terminate these development standards and conditions.
6. Except as otherwise modified by this approval, all material representations made by the
applicant or applicant representative(s) in this application and in public hearing(s) shall
be adhered to and considered binding conditions of approval.
Adopted this 6th day of January, 2003
Signed:
&IV7 Date:
Chris Evans, Chairman
Attest: .
Date:
Terry Smith, ecretary