PZC Minutes 020601Minutes of Planning & Zoning Commission
Regular Meeting
February 6, 2001
Council Chambers
Town of Avon Municipal Building
400 Benchmark Road
I. Call to Order
The meeting was called to order at 6:00 p.m.
II. Roll Call
Commissioners Evans, Macik, Sipes and Klein were present. Commissioners
Fehlner, Head and Karow were absent.
Ill. Additions and Amendments to the Agenda
Final Design Lot 73, Block 4, Wildridge Subdivision was moved to the Consent
Agenda.
IV. Conflicts of Interest
None
V. Consent Agenda
A. Approval of the January 16, 2001 Planning & Zoning
Commission Meeting Minutes
B. Lot 73, Block 4, Wildridge Subdivision
Project Type: Duplex
Applicant: Kate O'Connor Steffens
Address: 5300 Ferret Lane
Owner: Michele Tobin
Item B was approved with the following conditions:
1. The site plan must be revised to address these items:
A. Positive drainage away from the northwest corner of the building
must be provided.
B. The culverts must be installed in accordance with the Town of Avon
Standard Detail and will require additional regrading.
C. Indicate the 10 -foot snow storage and drainage easement on the
Cul -du -Sac side of the property line.
D. The address sign be relocated out of the 10 -foot snow storage and
drainage easement.
2. Landscaping plan must be revised to include a minimum of five (5)
additional Quaking Aspen and /or Colorado Blue Spruce groupings along
the south and west sides of the property.
Commissioner Sipes moved to approve the Consent Agenda Items A & B.
Commissioner Klein seconded the motion. The motion carried unanimously.
VI. Condition of Final Design Approval
A. Lot C, Block 2, Benchmark at Beaver Creek
Project Type: Mock -up of Colors and Materials
Applicant: Vistana, Inc.
Address: 0160 Beaver Creek Boulevard West
Staff did not make a presentation. Aleksandr Sheykhet of Oz Architecture represented
the applicant. Chairman Evans commented that those who reviewed the mockup today
were very impressed and pleased with the revisions.
Commissioner Klein said everything looked good except for the pinkish color of the one
set of siding and shingles.
Commissioner Sipes stated the applicant has made vast improvements. The palette
works well and falls within our guidelines. However, the way you are applying the two
different shingle colors around the building does not keep with other nearby properties
and seems random. He believes one color should be the focus and the accent of the
building.
Mr. Sheykhet said he can take one more look at it.
Commissioner Macik asked if there was another submittal of the rails. Aleksandr said
there are two options: one is the copper color and the other would be taking the same
color as the metal and apply it to the pickets. The copper color did not come out the
way we intended it. It is not what we are proposing for the final color. He showed a
sample of the proposed paint color. We like the copper option. Commissioner Macik
also stated the rose color is not good seeing how much of it would be on the building.
He asked what the soffit material would be. Aleksandr said it would be exterior gypsum
board with stucco finish.
Chairman Evans commented the colors are much more coherent now but he does not
care for the rose color. He said he would rather see the copper color pickets with the
Minutes of P &Z Meeting
February 6, 2001
Page 2
wood trim for the railings and have it brought around to the Employee Housing building
to tie in the two structures. The stone is much better. It would be good if you could
review the color of the rose and the green shingles. It would not be a condition of
approval, but if you could, Staff could look at it and approve it rather than bring it back
here.
Mr. Sheykhet said he appreciated the efforts on the mockup. Regarding the colors, we
are not satisfied with them as they are and are still working on them. We are using the
same railing detail for the balconies on the employee housing and timeshare buildings.
The guard railing will be very closely related. We are willing and interested in looking at
the application of the colors. We will submit them as we get ready to do it.
Commissioner Sipes moved to approve the mockup of colors and materials as viewed
on -site by the Planning and Zoning Commission with the following conditions:
1. The copper picket color on the guardrail design and the mauve shingle color
design is not approved.
2. The applicant will bring back to Staff the revised colors indicating them on a full
set of elevations.
Commissioner Klein seconded the motion. The motion carried unanimously.
VII. Work Session
A. Design Review Guidelines
Planner, Tambi Katieb, asked the Commission to give any feedback or comments on
priorities or ranking of the sections by the end of this week or early next week.
Commissioner Sipes said it would work if at each meeting, a section would be given us
as a handout to review and return by the next meeting with comments. That way we will
have a work session at each meeting on a specific section. Chairman Evans said they
could be given to us in order of priority ranked by the Commission.
VIII. Other Business
A. Staff Approvals:
1. Lot C, Avon at Beaver Creek
Sheraton's Mountain Vista
Revised Pool Area
2. Sign Permits: None
Minutes of P &Z Meeting
February 6, 2001
Page 3
The Commission asked about the status of the Confluence and gondola. Mr. Matzko
said there would be discussion of the gondola at the Council Work Session on February
13th
IX. Adjourn
Chairman Evans moved to adjourn the meeting. Commissioner Macik seconded the
motion. The motion was approved unanimously. The meeting adjourned at 6:30 p.m.
Respectfully submitted,
Cecelia Fenton
Recording Secretary
APPROVED: February 20, 2001
Chris Evans
Chairman
Andrew Karow '
Secretary